RES – Turbine location update. August 10, 2018
All of the Original 131 Cases have been terminated, at this time RES does not have any locations approved by the FAA.
On July 07/06/2018 there were 69 proposed Cases submitted to the FAA for Wind turbines. There are 2 sets of Cases a group with structure names T1 – T49, and another A1 – A20.