Wind Turbines
STRAIGHT TALK WIND ENERGY TECHNOLOGY FACTS WeCAREsd.org
Nordex – Rules of Conduct on, in and around Wind Turbines
Pepin Email – Vestas Safety Manual, Mechanical Operating and
Maintenance Manual.
Safety of Wind Systems (pdf), M. Ragheb
Wind Energy Sector, Occupational Health and Safety Risks and Accident Prevention Strategies
Transmission Lines
American Transmission Co. 10-Year Transmission System Assessment. 2018.
Summary Report (pdf) Michigan’s Upper Peninsula and Northern Wisconsin – Zone 2 Projects and Details
How the electric transmission system works. Minnesota’s Electric Transmission System
<!—
SA 3101 SUMMIT LAKE WIND-ATC GIA VERSION 32.0.0
Project J711 GENERATOR INTERCONNECTION AGREEMENT
entered into by the Midcontinent Independent System Operator, Inc.,
Summit Lake Wind, LLC, And American Transmission Company LLC
https://etariff.ferc.gov/TariffBrowser.aspx?tid=1446
https://elibrary.ferc.gov/idmws/docket_sheet.asp?docket=ER19-1034&Subdocket=000
https://elibrary.ferc.gov/idmws/docket_sheet.asp?docket=ER18-976&Subdocket=000
https://elibrary.ferc.gov/idmws/docket_sheet.asp?docket=ER18-2328&Subdocket=000
https://elibrary.ferc.gov/idmws/file_list.asp?document_id=14758943
GI-FeS-2016-OCTOBER-J711-Report100276.pdf
GI-DPP-2017-AUG-ATC-UPMI-Phase1_SIS_Report_FINAL189128.pdf (Withdrawn)
SA 3102 UMERC-SUMMIT LAKE-ATC MPFCA VERSION 31.0.0
Project J704 J711 MULTI-PARTY FACILITIES CONSTRUCTION AGREEMENT
entered into by the Midcontinent Independent System Operator, Inc.,
And J704 IC – Upper Michigan Energy Resources Corporation
J711 IC – Summit Lake Wind, LLC
And American Transmission Company, LLC
—>